Planning a Porta Potty for Your Los Angeles ADU Build
Backyard ADUs and garage conversions run for months on tight lots. Here is how to keep the jobsite toilet out of your way.

Who provides the porta potty for an ADU build?
The general contractor usually provides the jobsite porta potty for an ADU build and lists it in the bid. Owner-builders and some small contractors leave the toilet to the homeowner. Ask before the first crew day so workers are not using your home bathroom.
How long will I need a porta potty for an ADU?
A detached ADU in Los Angeles typically takes 6–12 months to build after permits, and a garage conversion about 3–6 months. A porta potty rented by the 28-day cycle with weekly service covers the whole build; you end billing with a pickup request.
Where does the porta potty go on a tight LA lot?
On a tight Los Angeles lot, the porta potty usually goes at the front corner of the driveway or in a side yard close to the street, so the service truck can reach it each week. Backyard placement near the ADU often fails the 30-foot carry limit.
- Alley lots: an alley-side spot keeps the unit off the front yard.
- Shared driveways: get your neighbor's OK before placing it there.
- Street placement needs a right-of-way permit in most cities.
How many units for an ADU crew?
One standard porta potty with weekly service covers an ADU crew of up to about 10 workers. During framing, drywall or finish phases with 2–3 trades on site at once, add a second unit or a second weekly service.
Quick answers
Can I use an event rate for a short ADU phase?
Construction phases bill by the 28-day cycle with weekly service. An event rate fits only 1–5 day uses without cleaning, such as a weekend demolition.
Does the porta potty need a permit for my ADU?